1. Power Rd NB and SB lane shifts between Ocotillo Rd and Brooks Farms for road improvements. Jan. 16 – May. 15; 24-hour
  2. Riggs Rd EB lane shift between Power Rd and Hawes Rd for roadway improvements. Feb. 21 – Apr. 30; 24-hour
  3. Gary Rd SB lane shift at Combs Rd for flagging operations, sub grade prep, and paving. Apr. 15 – May 17; 9 am – 2 pm
  4. Ellsworth Rd NB and SB lane shift between Germann Rd and Queen Creek Rd for roadway widening. Apr. 08 – Apr. 22; 9 am – 2:30 pm
  5. Empire Rd full closure between Signal Butte Rd and 220th Street for water line install. Apr. 15 – May 15; 24-hour
  6. Combs Rd WB lane shift at meridian Rd for removal of concrete ditch. Apr. 15 – May. 15; 24-hour

Comments