1. Power Rd NB and SB lane shifts at Ocotillo Rd for median work. Apr. 18 – Apr. 30; 24-hour
  2. Riggs Rd EB lane shift between Power Rd and Hawes Rd for roadway improvements. Feb. 21 – Apr. 30; 24-hour
  3. Gary Rd SB lane shift at Combs Rd for flagging operations, sub grade prep, and paving. Apr. 15 – May 17; 9 am – 2 pm
  4. Ellsworth Rd NB and SB lane shift between Germann Rd and Queen Creek Rd for roadway widening. Apr. 08 – May 03; 9 am – 2:00 pm
  5. Empire Rd full closure between Signal Butte Rd and Village lane for water line install. Apr. 15 – May 15; 24-hour
  6. Combs Rd WB lane shift at meridian Rd for removal of concrete ditch. Apr. 15 – May. 15; 24-hour
  7. Queen Creek Rd EB and WB lane shift at Crismon Rd for utility work. Apr. 16 – Apr. 26; 24-hour
  8. Signal Butte Rd SB lane shift between Nightingale Rd and Appleby Rd for cable work. Apr. 23 – Apr. 26; 8:30 am – 4 pm
  9. Cloud Rd EB and WB lane shift between Rittenhouse RD and Crismon road for water and sewer line install. Apr. 16 – Jul. 30; 24-hour
  10. Ocotillo Rd EB and WB lane shift and flagging operations for gas and electric install. Apr. 22 – May 03; 9 am – 2 pm
  11. Rittenhouse Rd NB and SB lane shift at Ocotillo Rd for directional drilling and potholing utilities work. Apr. 20 – Apr. 28; 8 pm – 5 am on weekends; 9 am – 2 pm on weekdays

Comments