1. Riggs Rd EB and WB lane shifts from Power Rd to Hawes Rd for roadway improvements. Mar. 18 – Feb. 18; 24-hour 
  2. Power Rd NB and SB lane shifts between Ocotillo Rd and Brooks Farms for road improvements. Jan. 16 – Mar. 04; 8:30 am – 2 pm 
  3. Rittenhouse Rd NB lane shift between Combs Rd and Railroad Spur crossing for roadway widening. Feb. 01 – Apr. 01; 24-hour 
  4. Sossaman Rd NB and SB lane shift between Via Del Verde and Ocotillo Rd for erosion repairs. Jan. 24 – Feb. 15; 8:30 am – 4 pm 
  5. Barnes Pkwy EB and WB lane shift between Shetland St and 212th St for asphalt hot patching. Feb. 04 – Feb. 18; 8:30 am – 4 pm 
  6. Rittenhouse Rd SB lane shift at Germann Rd for sidewalk repair and driveway install. Feb. 05 – Feb. 19; 8:30 am – 4 pm 
  7. Ellsworth Rd SB lane shift at Cloud Rd for water line repair. Feb. 04 – Feb. 15; 8:30 am – 2:30 pm 
  8. Ocotillo Rd EB lane shift between Ironwood and Stetson Rd. Feb. 06 – Feb. 18; 9 am – 2 pm 
  9. Queen Creek Rd EB and WB lane shift at Ellsworth Rd for road widening work. Feb. 06 – Mar. 04; 24-hour 
  10. Meridian Rd NB road closure at Ocotillo Rd with no right or left turn onto NB Meridian Rd for water line install. Feb. 13 – Feb. 14 
  11. **Advance notice** Power and Ocotillo Rd intersection closure for street light install, grading, paving and striping. Mar. 01 – Mar. 04; 24- hour 
  12. Rittenhouse Rd SB lane shift between 211th Way and E Village Loop Rd S for paving work. Feb. 7 – Feb. 15; 24-hour 
  13. Cloud Rd EB and WB lane shift between Rittenhouse and Crismon Rd for utility work. Feb. 7 – Mar. 30; 24-hour 
  14. Gary Rd SB lane shift between Riggs Rd and Mews Rd for temporary road widening. Feb. 11 – Feb. 19; 24-hour 

Comments