Queen Creek Area Roadway Restrictions

  1. Rittenhouse Rd NB lane shift from 213th street to north of Queen Creek Bridge for road improvements. Jan. 15 – Oct. 02; 24-hour
  2. Ironwood Rd NB lane shift at Pima Rd for median turn lane install. Jan. 20 – Mar. 16; 9 am – 2 pm
  3. Ocotillo Rd EB and WB lane shifts between Meridian Rd and 220th street for roadway repairs. Jan. 16 – Mar. 02; 24-hour
  4. Signal Butte NB and SB lane shift between Ocotillo Rd and Appleby Rd for roadway repairs. Jan. 16 – Mar. 02; 24-hour
  5. Combs Rd EB and WB lane shifts between Kenworthy and Painted Desert Dr for sewer work. Feb. 17 – Jun. 3;24-hour Left turn lanes will be prohibited from Combs onto Gantzel. Feb. 17 – Mar. 16; 24-hour
  6. Ocotillo Rd EB and WB lane shift at Victoria lane and Victoria Lane NB and SB lane shift at Ocotillo Rd all for Traffic Signal install. Jan. 30 – Apr. 03; 8:30 am – 2:30 pm
  7. Ocotillo Rd EB and WB lane shifts with left turn lane restrictions between Sossaman Rd and Hawes Rd for utility pothole work. Feb. 03 – Feb. 29; 8:30 am – 2:30 pm
  8. Rittenhouse Rd NB and SB lane shifts from just south of Via De Palmas for bridge widening work. Feb. 07 – Apr. 30; 24-hour
  9. Ellsworth Loop Rd NB lane shift between Victoria Ln and Maya Rd for bore work. Feb. 10 – Feb. 24; 9 am – 2:30 pm
  10. Kenworthy Rd NB and SB shoulder closures and lane shifts between Combs Rd and Hash knife Draw Rd for sewer work. Feb. 17 – May 30; 24-hour
  11. Combs Rd WB shoulder closures between Kenworthy Rd and Schnepf Rd for sewer work. Feb. 17 – May 30; 24-hour (outside Town Limits)
  12. Queen Creek Rd EB and WB lane shifts East of Signal Butte Rd for sewer work. Feb. 17 – Mar. 01; 24-hour
  13. Meridian Rd NB and SB lane shift at Via Del Jardin for concrete pour work. Feb. 17 – Feb. 21; 24-hour
  14. Twin Acres Dr EB and WB lane shift with flagging operations at Sossaman Rd for water main install. Feb. 17 – Jun. 17; 7 am – 3 pm
  15. Ivy Lane EB and WB lane shift with flagging operations at Power Rd for sewer line connection. Feb. 17 – Feb. 28; 8:30 am – 2:30 pm
  16. Queen Creek Rd WB lane shift between Emperor Blvd and 194th St for utility work. Feb. 19 – Feb. 20; 8:30 am – 2:30 pm

Comments