1. Rittenhouse Rd NB and SB lane shift at Ocotillo Rd for directional drilling and potholing utilities work. Apr. 29 – May 03; 8:30 am – 2:30 pm
  2. Riggs Rd EBlane shift between Power Rd and Hawes Rd for roadway improvements. Feb. 21 – Apr. 30; 24-hour
  3. Gary Rd SBlane shift at Combs Rd for flagging operations, sub grade prep, and paving. Apr. 15 – May 17; 9 am – 2 pm
  4. Ellsworth Rd NB and SBlane shift between Germann Rd and Queen Creek Rd for roadway widening. Apr. 08 June 30; 9 am – 2:00 pm
  5. Empire Rdfull closure between Signal Butte Rd and Village lane for water line install. Apr. 15 – May 15; 24-hour
  6. Combs Rd WBlane shift at meridian Rd for removal of concrete ditch. Apr. 15 – May. 15; 24-hour
  7. Cloud Rd EB and WBlane shift between Rittenhouse RD and Crismon road for water and sewer line install. Apr. 16 – Jul. 30; 24-hour
  8. Ocotillo Rd EB and WBlane shift and flagging operations for gas and electric install. Apr. 22 – May 03; 9 am – 2 pm
  9. Ellsworth Rd SB lane shifts at Empire for boring, trenching and potholing utility work. Apr. 30 – May 07; 8 pm – 5 am

Comments