Queen Creek Area Roadway Restrictions:

  1. Rittenhouse Rd NB lane shift from 213th street to north of Queen Creek Bridge for road improvements.
    Jan. 15 – Oct. 02; 24-hour
  2. Ironwood Rd NB lane shift at Pima Rd for median turn lane install.
    Jan. 20 – Mar. 16; 9 am – 2 pm
  3. Combs Rd EB and WB lane shifts between Kenworthy and Painted Desert Dr for sewer work. Feb. 17 – Jun. 3;24-hour Left turn lanes will be prohibited from Combs onto Gantzel.
    Feb. 17 – Mar. 16; 24-hour
  4. Ocotillo Rd EB and WB lane shift at Victoria lane and Victoria Lane NB and SB lane shift at Ocotillo Rd all for Traffic Signal install.
    Jan. 30 – Apr. 03; 8:30 am – 2:30 pm
  5. Rittenhouse Rd NB and SB lane shifts from just south of Via De Palmas for bridge widening work.
    Feb. 07 – Apr. 30; 24-hour
  6. Kenworthy Rd NB and SB shoulder closures and lane shifts between Combs Rd and Hash knife Draw Rd for sewer work.
    Feb. 17 – May 30; 24-hour
  7. Combs Rd WB shoulder closures between Kenworthy Rd and Schnepf Rd for sewer work.
    Feb. 17 – May 30; 24-hour (outside Town Limits)
  8. Twin Acres Dr EB and WB lane shift with flagging operations at Sossaman Rd for water main install.
    Feb. 17 – Jun. 17; 7 am – 3 pm
  9. Germann Rd EB and WB shoulder work at Crismon Rd for new traffic signal install.
    Feb. 19 – Apr. 19; 24-hour
  10. Ocotillo Rd EB and WB lane shifts between Meridian Rd and 220th street for roadway repairs.
    Jan. 16 – Mar. 31; 24-hour
  11. Signal Butte NB and SB lane shift between Ocotillo Rd and Appleby Rd for roadway repairs.
    Jan. 16 – Mar. 31; 24-hour
  12. Combs Rd WB shoulder closure between Painted Desert Dr and Meridian Rd for adding an additional lane.
    Mar. 09 – Mar. 27; 8:30 am – 2:30 pm
  13. Germann Rd WB shoulder closure between Signal Butte Rd and Meridian Rd for utility work.
    Mar. 06 – Jun. 12; 24-hour
  14. Meridian Rd Full Closure between Ocotillo Rd and Lenora RD for emergency utility work until further notice. Please follow detour signs posted.
  15. Rittenhouse Rd NB and SB shoulder work between Queen Creek wash bridge and Riggs Rd for edge line work.
    Mar. 16 – Jul. 30; 24-hour

Creek Library Parking Lot Resurfacing – The North and South side parking lots resurfacing section will be closed to the public from 6 am Mar. 21 to 3 pm Mar. 22

Comments