Chandler:

  • PECOS RD EB. Road construction on PECOS RD from EMMETT DR to GILBERT RD Lane Restrictions, lane closed. Fri, 07 Sep 2018 to Fri, 12 Oct 2018. 08:30 AM to 04:00 PM
  • McQueen Rd from Riggs Rd. Road Maintenance closed due to road construction. Road closed, follow the detour. Mon, 24 Sep 2018 to Fri, 19 Oct 2018. 12:00 AM to 12:00 PM
  • QUEEN CREEK RD both directions. Work on manholes on QUEEN CREEK RD from MCQUEEN RD to GILBERT RD. Mon, 10 Sep 2018 to Mon, 15 Oct 2018. 08:30 AM to 04:00 PM

Gilbert:

  • Lane Restrictions, lane closed at the following location: Higley Rd btwn Guadalupe Rd and Elliot Rd. Additional Details: NB/SB restricted to one lane with left turn restrictions at Washington, Park Cullumber and Page. Mon, 27 Aug 2018 to Tue, 09 Oct 2018. 12:00 AM to 12:00 PM
  • Pecos Rd from Allen to Lindsay Rd. Lane Restrictions, lane closed. Lane Restrictions at the following location: Pecos Rd from Allen to Lindsay Rd. Additional Details: Lanes restrictions. Sun, 09 Sep 2018 to Sat, 20 Oct 2018. 12:00 AM to 12:00 PM.

Chandler Heights Area:

  • Riggs Rd from Power Rd to Hawes Rd. Lane Restrictions, lane closed. Left lane closed. Sun, 29 Jul 2018 to Fri, 30 Nov 2018. 12:00 AM to 12:00 PM
  • Sossaman Rd and Riggs Rd. Lane Restrictions, lane closed. Right lane closed. Sun, 29 Jul 2018 to Fri, 23 Nov 2018. 12:00 AM to 12:00 PM
  • Riggs Rd from Power Rd to Hawes. Lane Restrictions, lane closed. Left lane closed. Rd. Sun, 29 Jul 2018 to Fri, 30 Nov 2018. 12:00 AM to 12:00 PM

San Tan Valley:

  • Work is currently taking place in the south end of the project, from Johnson Ranch Boulevard/Gantzel Road to Magma Road in Hunt Highway to construct improvements. Current work includes utility work on the west side of Hunt Highway, with Hunt remaining open for travel, one lane in each direction, with traffic shifted away from the work zone.
  • Scheduled to take place Monday, October 1, electric crews will work at the traffic signal on Copper Mine Road and Hunt Highway to place a temporary signal, and energize the new poles to keep the signal in service. During this work, there may be periods where signal timing is delayed with longer waits at the signal, so we ask your patience during this transition.
  • Also scheduled for the week of October 1, paving crews will pave Judd Road with the base and surface layers of asphalt. This work is expected to be complete by the end of the week, with striping scheduled for October 8, so Judd and Tourmaline Roads can be opened for travel on Tuesday, October 9. Please note that rain or equipment issues may require adjustments to this schedule.

Queen Creek:

  • Riggs Rd EB and WB lane shifts from Power Rd to Hawes Rd for roadway improvements. Mar. 18 – Nov. 12; 24-hour
  • Power Rd NB and SB lane shifts between Ocotillo Rd and Brooks Farms for road improvements. Jun. 25 – Oct. 31; 24-hour
  • Ellsworth Rd NB lane shift at Fulton Pkwy for electrical work. Oct. 08 – Oct. 12; 9 am – 2 pm. **Additional delays anticipated Oct. 10, 9 am – 2 pm during traffic signal installation**
  • 220th St NB and SB lane shift at Ocotillo Rd for boring and utility work. Sep. 24 – Oct. 19; 9 am – 2 pm
  • Ironwood Rd SB right lane shift at Pima Rd for landscape work. Oct. 03 – Oct. 11; 9 am – 2 pm
  • Hunt Hwy EB and WB flagging operations at Bell Rd for pavement preservation work. Oct. 09 – Oct. 23; 8:30 am – 4 pm
  • Sossaman NB and SB flagging operations at Twin Acres Dr for pavement preservation work. Oct. 09 – Oct. 23; 8:30 am – 4 pm
  • **Advance Notice** Victoria Blvd NB full closure at Ocotillo Road for Sewer work. Oct. 15; Oct. 19; 24-hour
  • **Advance Notice** Ellsworth Road full closure from Ocotillo to Rittenhouse for Trunk or Treat Event. Oct. 20 at 5 am until Oct. 21 to 1 am
  • Rittenhouse Rd NB and SB lane shifts between Ocotillo Rd and Pickett St for bore and pothole work. Sep. 10 –Oct. 10; 9 am – 2 pm
  • Cloud Rd EB and WB lane shift between 214th St and Crismon Rd for Cloud Rd widening. Jul. 26 – Nov. 09; 24-hour
  • Victoria Ln WB right bike lane closure between Ellsworth Rd and Ellsworth Loop Rd for driveway work. Oct. 05 – Oct. 19; 24-hours

Comments