With many area commuters traveling outside of the area for work, San Tan Times has begun to expand the travel advisories.

San Tan Valley

Utility Work on Bella Vista Road 

Utility work will begin on Bella Vista Road west of Gantzel Road intersection on September 3rd.  Work is expected to take one month to complete.  There will be a speed reduction and a lane closure for eastbound travel on Bella Vista Road as well as possible sidewalk restrictions along the south side of Bella Vista Road. Please use caution while driving through work zones.

Hunt Highway Expansion

Traffic, between Gantzel/Johnson Ranch and Magma, has shifted to the east side of the road and onto temporary pavement. Lane shifting at the intersection of Hunt and Gantzel continues to vary as road work continues. Drive slowly and be aware of potential changes to lane shifts in this area.

Chandler:

  • On PRICE RD Lane Restrictions, lane closed. Utility on PRICE RD from WILLIS RD to SPECTRUM BL. Mon, 02 Jul 2018 to Fri, 14 Sep 2018; from 08:30 AM to 04:00 PM
  • On ARIZONA AV both directions. Road construction on ARIZONA AV from PECOS RD to FRYE RD. Lane Restrictions, lane closed. Thu, 16 Aug 2018 to Sun, 16 Sep 2018; 08:30 AM to 04:00 PM
  • On FRYE RD both directions Lane Restrictions, lane closed. Water line work on FRYE RD from ARIZONA AV to PALM LN. Thu, 09 Aug 2018 to Sun, 09 Sep 2018; 08:30 AM to 04:00 PM
  • On Glenburn Dr from Riggs Rd to Riggs Rd. Lane Restrictions, lane closed. Right lane closed. Tue, 14 Aug 2018 to Fri, 14 Sep 2018; 08:30 AM to 04:00 PM.

Gilbert:

  • On NB on Greenfield, NO LEFT HAND TURNS NB. Public Notes Turn Lane Closure at the following location: NB on Greenfield NO LEFT HAND TURNS. Lane Restrictions, lane closed. Mon, 23 Jul 2018 to Fri, 07 Sep 2018; 12:00 AM to 12:00 PM
  • Elliot Rd from Power Rd to Power Rd. Road Maintenance closed due to road construction. Road closed, flagging operation, be prepared to stop. Thu, 06 Sep 2018 to Fri, 28 Sep 2018; 08:30 AM to 03:30 PM.
  • On Santan Village Pkwy. Lane Restrictions, lane closed. Turn Lane Closure at the following location: Santan Village Pkwy. Through traffic restricted to one lane also left turns shifted. From Mon, 23 Jul 2018 to Sun, 23 Sep 2018. From 12:00 AM to 12:00 PM

Mesa:

  • On Adobe Rd from Higley Rd to Recker Rd. Road Maintenance closed due to road construction. Duration from Thu, 06 Sep 2018 to Thu, 13 Sep 2018. From 06:00 AM to 06:00 PM

Queen Creek:

New road work begins:

  • Power Rd full closure between Ocotillo Rd and Brooks Farms Rd for SRP electrical crossing begins September 10 and runs through September 13 during the hours of 8 PM – 5 AM

Existing road work currently underway:

  • Victoria Ln westbound lane shift and eastbound right turn lane closure between Ellsworth Rd and Ellsworth Loop Rd for utility work begins September 4  and runs through September 12 during the hours of 9 AM – 2 PM.
  • Ellsworth Rd southbound and northbound lane shift between Queen Creek Rd and Fulton Pkwy for electrical work begins September 4  and runs through September 05 during the hours of 9 AM – 2 PM. 
  • Riggs Rd EB and WB lane shifts from Power Rd to Hawes Rd for roadway improvements. Mar. 18 – Nov. 12; 24-hour
  • Power Rd NB and SB lane shifts between Ocotillo Rd and Brooks Farms for road improvements. Jun. 25 – Oct. 31; 24-hour
  • Cloud Rd EB and WB lane shift and flaggers between 214th St and Crismon Rd for Cloud Rd widening. Jul. 26 – Sep. 16; 24-hour
  • Ironwood Rd SB lane shift at Ocotillo Rd for driveway install. Aug. 8 – Sep. 28; 24-hour
  • Germann Rd EB and WB lane shifts from Ellsworth Rd to Crismon Rd for gas line install. Aug. 24 – Sep. 28; 24-hour
  • Ellsworth Rd NB lane shift between Rittenhouse Rd and Queen Creek Rd for electrical work. Aug. 22 – Sept. 12; 9 am – 2 pm
  • Hawes Rd NB and SB lane shift at Chandler Heights Rd for fire line work. Aug. 27 – Sept. 07; 9 am – 2 

Comments