With many area commuters traveling outside of the area for work, San Tan Times has begun to expand the travel advisories.

San Tan Valley

Utility Work on Bella Vista Road 

Utility work began on Bella Vista Road west of Gantzel Road intersection on September 3rd. Work is expected to take one month to complete. There will be a speed reduction and a lane closure for eastbound travel on Bella Vista Road as well as possible sidewalk restrictions along the south side of Bella Vista Road. Please use caution while driving through work zones.

Hunt Highway Expansion

Traffic, between Gantzel/Johnson Ranch and Magma, has shifted to the east side of the road and onto the temporary pavement. Lane shifting at the intersection of Hunt and Gantzel continues to vary as road work continues. Drive slowly and be aware of potential changes to lane shifts in this area.

Chandler:

  • McQueen Rd from Riggs Rd. Road Maintenance closed due to road construction. Road closed, follow the detour. Mon, 24 Sep 2018 to Fri, 19 Oct 2018. 12:00 AM to 12:00 PM
  • On ARIZONA AV both directions. Road construction on ARIZONA AV from PECOS RD to FRYE RD. Lane Restrictions, lane closed. Thu, 16 Aug 2018 to Sun, 16 Sep 2018; 08:30 AM to 04:00 PM
  • QUEEN CREEK RD both directions. Work on manholes on QUEEN CREEK RD from MCQUEEN RD to GILBERT RD. Mon, 10 Sep 2018 to Mon, 15 Oct 2018. 08:30 AM to 04:00 PM

Chandler Heights Area:

  • Riggs Rd from Power Rd to Hawes Rd. Lane Restrictions, lane closed. Left lane closed. Sun, 29 Jul 2018 to Fri, 30 Nov 2018. 12:00 AM to 12:00 PM
  • Sossaman Rd and Riggs Rd. Lane Restrictions, lane closed. Right lane closed. Sun, 29 Jul 2018 to Fri, 23 Nov 2018. 12:00 AM to 12:00 PM
  • Riggs Rd from Power Rd to Hawes. Lane Restrictions, lane closed. Left lane closed. Rd. Sun, 29 Jul 2018 to Fri, 30 Nov 2018. 12:00 AM to 12:00 PM

Mesa:

On Adobe Rd from Higley Rd to Recker Rd. Road Maintenance, closed due to road construction. Duration from Thu, 06 Sep 2018 to Thu, 13 Sep 2018. From 06:00 AM to 06:00 PM 

Gilbert:

  • Elliot Rd from Power Rd to Power Rd. Road Maintenance closed due to road construction. Road closed, flagging operation, be prepared to stop. Thu, 06 Sep 2018 to Fri, 28 Sep 2018; 08:30 AM to 03:30 PM.
  • Pecos Rd from Allen to Lindsay Rd. Lane Restrictions, lane closed. Lane Restrictions at the following location: Pecos Rd from Allen to Lindsay Rd. Additional Details: Lanes restrictions. Sun, 09 Sep 2018 to Sat, 20 Oct 2018. 12:00 AM to 12:00 PM.

Queen Creek:

  • Queen Creek Area Roadway Restrictions:
  • Riggs Rd EB and WB lane shifts from Power Rd to Hawes Rd for roadway improvements. Mar. 18 – Nov. 12; 24-hour
  • Power Rd NB and SB lane shifts between Ocotillo Rd and Brooks Farms for road improvements. Jun. 25 – Oct. 31; 24-hour
  • Ironwood Rd SB lane shift at Ocotillo Rd for driveway install. Aug. 8 – Sep. 28; 24-hour
  • Germann Rd EB and WB lane shifts from Ellsworth Rd to Crismon Rd for gas line install. Aug. 24 – Sep. 28; 24-hour
  • Ocotillo Rd WB and Signal Butte Rd SB shoulder closure at the intersection of Ocotillo Rd and Signal Butte Rd for grading work.Sep. 04 – Sep. 28; 24-hour
  • Ocotillo Rd EB shoulder closer at Prince Ave for curb and gutter work. Sep. 05 – Sep. 28; 24-hour
  • Power Rd NB and Chandler Heights WB lane shifts at the intersection for right turn lanes install. Sep. 17 – Sep. 28; 24-hour
  • Cloud Rd EB and WB lane shift between Signal Butte Rd and Rittenhouse Rd for potholing work. Sep. 10 – Sep. 26; 9 am – 2 pm
  • Rittenhouse Rd NB and SB lane shifts between Ocotillo Rd and Pickett St for bore and pothole work. Sep. 10 – Sep. 26; 9 am – 2 pm
  • Rittenhouse Rd NB and SB lane shifts with flagging operations between Combs Rd and Alliance Lumber entrance for temporary road widening. Sep. 24 – Sep. 27; 8 pm – 5 am
  • Ellsworth Rd NB lane shift at Fulton Pkwy for electrical work. Oct. 01 – Oct. 05; 9 am – 2 pm
  • 220th St NB and SB lane shift at Ocotillo Rd for boring and utility work. Sep. 24 – Oct. 05; 9 am – 2 pm