Upcoming Magma Road -Hunt Highway to Gary Rd Project

  • 60% Design plans complete
  • December 2018 application made to the State Land Department for right-of-way
  • Project scheduled to start construction in fiscal year 2019/2020
  • Approved funding changed by Transportation Advisory Committee on 2/26/19

The extension will provided access from Hunt Highway to Gary Road. The access point will be South of Copper Mine Road and North of Stardust Drive. You can download the full PDFs of the plans and drawings online from the county. For your convenience we have included the links to both maps below.

Topographical maps (529KB)
Provides an overly of the location of the road in conjunction to current terrain and development.

Drawings (22 MB)
Architectural line drawing of project.

Comments