1. I-10 EB closed between 67th and 51st avenues in west Phoenix for construction of Loop 202 South Mountain Freeway interchange. I-10 EB on-ramps at 91st, 83rd, 79th and 75th avenues also closed. Expect heavy traffic and consider exiting I-10 EB ahead of the closure and using alternate routes. EB McDowell Rd or Van Buren St are local detour routes. I-10 EB also narrowed to two lanes between 51st and 43rd avenues. 9 p.m. Friday – 4 a.m. Monday (Aug. 26)
    Note: Through travelers on I-10 EB west of SR 85 who don’t require a stop in Phoenix area can avoid this I-10 closure by detouring on SR 85 SB in Buckeye area to I-8 EB to reach I-10 in Casa Grande area.
  2. Loop 101 EB (Pima Freeway) closed between Scottsdale and Hayden roads in north Scottsdale for freeway widening project. Loop 101 EB on-ramps at 56th and 64th streets also closed. Expect heavy traffic and consider exiting Loop 101 EB ahead of the closure and using alternate routes. Drivers can use SR 51 SB or Tatum Blvd to EB Bell Rd/Frank Lloyd Wright Blvd to connect with Loop 101. Note: 16th St also closed in both directions at Loop 101 for widening project. No through traffic allowed under the Loop 101 bridge. Traffic can detour along frontage roads. 10 p.m. Friday – 5 a.m. Monday (Aug. 26)
  3. Loop 202 WB (South Mountain Freeway)/Pecos Rd closed between I-10 and 32nd St in Ahwatukee area for pavement work. Both I-10 ramps to Loop 202 WB closed. Alternate routes include Chandler Blvd. 4 10 p.m. Friday – 5 a.m. Monday (Aug. 26)
  4. 10 p.m. Friday – 5 a.m. Monday (Aug. 26) I-17 SB closed overnight between Happy Valley and Pinnacle Peak roads in north Phoenix for bridge work. I-17 SB on-ramp at Jomax Rd also closed. Expect heavy traffic. Traffic will detour on local roadways. Alternate routes include exiting to EB Jomax Rd and using SB 19th Ave to WB Pinnacle Peak or Deer Valley roads to access I-17. 10 p.m. Friday – 7 a.m. Saturday (Aug. 24)
    I-17 NB closed between Pinnacle Peak and Happy Valley roads for bridge work. I-17 NB on-ramp at Deer Valley Rd also closed. Expect heavy traffic. Traffic will detour on local roadways. Alternate routes include exiting to EB Deer Valley Rd and using NB 19th Ave to WB Happy Valley or Jomax roads to access I-17. 10 p.m. Saturday – 9 a.m. Sunday (Aug. 25)
  5. Chandler Blvd closed in both directions at Loop 101 (Price Freeway) for freeway widening project. Consider alternate routes, including Ray or Frye roads. Traffic on Chandler Blvd can detour on Price frontage roads to reach nearby open cross streets. 11:45 p.m. Saturday – 9 a.m. Sunday (Aug. 25)
    Note: Loop 101 SB on-ramp at Ray Rd closed from 9 a.m. Sunday to 5 a.m. Wednesday, Oct. 9, for reconstruction. Loop 101 SB on-ramp at Baseline Rd and SB off-ramp at Price Rd closed from 5 a.m. Saturday to 5 a.m. Sunday (Aug. 25). Please use other area ramps.

Comments